380V Polyurethane Foam Machine , Sponge Production Line For Sofa / Shoes

Full-automatic Continuouse Polyurethane Foaming Machine for Sofa and Shoes

 

The ZHF-2017 Horizontal Continuously foam production line is an automatic continous foaming machine for producing flexible polyurethane foam used in furniture,shoe material,packing,electron,garment and transportation industrial.it's the ideal production equipment for large-scale foaming.

 

We use the siemens invertor/motor and U.S. viking pump and some good spare parts that good for make the flexible foam. The density we can make is from D8-D100 and we can add abt 50% of the lime powder during density above D23.

 

Main specification

 

 Oven Length 18m
 Foam Height 1.0-1.25m
 Foam Width 1.0-2.25m
 foam desity 8-200kg/m³
 total power 130KW
 inner coveyer length 18m
 side board adjustable width 0.98-2.3m
 conveyer belt speed 0-8m/min
 fall plate seven section adjustable
 total output 100-300kg/min
 machine dimension L35× W4.2 ×H3.2m
 

Main technique specification:

 

Dimension Total length 35m×Total width 4m×Total Height 3m
Foaming material Group 13 groups, man-machine interface, both manual and automatically computer control
Foaming width 980mm~2250mm
Foaming height Max 1200mm
Foaming density 8Kg/m³~100kg/m³
Foaming speed 2000r/min~7000r/min
Max total output 300kg/min
Material spraying way ① The way of down sprayer head (upper, down, front, back can be adjusted)         ② the way of trough overflow pipe.
Controlling way of foaming

①PLC controlling, can continuously foaming two different formulas in one time

②All inverter controlling foaming and work in phase with the production line

③Oven declining board height and width can be adjusted by control box.

④Oven side links width can be adjusted by control box

Mixing –head motor

37kw

Total power

About 90kw
 

Transducer Types

 

Model Power/kw Use Qty Brand
G120 37 Mixing head 1 Siemens
G120 7.5 POP, CaCo3 2 Siemens
G120 5.5 PPG, 1 Siemens
G120 4 TDI, Flame retardant 2 Siemens
G120 2.2 MC, color 2 Siemens
G120 1.5 Water, Ann, Si, Tin, Color Anti-yellow etc 7 Siemens
G120 0.75 Spray head 1 Siemens
VFD-B 5.5/3.7/1.5 Oven inner conveyer line,side conveyer line, cutting machine 3 Delta

 

FAQ:

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:What kind of raw material tools we need to prepare for the testing?

 

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

 

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

 

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

The main part of the machine

 

380V Polyurethane Foam Machine , Sponge Production Line For Sofa / Shoes

 

380V Polyurethane Foam Machine , Sponge Production Line For Sofa / Shoes

 

INSTRUCTION OF CONTINUOUS FAOMING MACHINE LINE.pdf

Products

Polyurethane Foam Machine

Call Us
Contact Supplier
Change Language